You May Pay A Heavy Price If You Don'T Pay Attention To Maintenance
You May Pay A Heavy Price If You Don’T Pay Attention To Maintenance
2022-01-13
Analysis Of 12 Structural Damage Cases Of Truck Tire Problems
Analysis Of 12 Structural Damage Cases Of Truck Tire Problems
2022-01-15

1.Specifications

Explanation Of Aikelan Gas Assisted Urea Pump Injection System

2、 Overview

2.1 composition of actnox 

SCR system SCR system consists of SCR catalytic muffler, urea tank, exhaust temperature sensor, nitrogen and oxygen sensor, urea supply unit (including electronic control unit), urea nozzle, air filter, and corresponding pipelines and harness. Actnox2. 0 (aikelan SCR system) is integrated into the urea supply unit and adopts no reflux design, so there is no need for urea reflux pipe.

Explanation

2.2 working principle of actnox SCR system

The urea tank is installed on the longitudinal beam of the vehicle frame, and the urea nozzle is installed on the exhaust pipe: the urea supply unit takes gas from the auxiliary air storage tank of the vehicle, the urea supply unit extracts urea solution from the urea tank, supplies urea to the urea nozzle through the urea heating pipe, and the coolant from the engine heats the urea tank through the cooling water pipe

3、 SCR system maintenance

★ Actnox2. 0 system is a post-processing system that can be used for many years without large-scale disassembly and assembly.

★ Actnox2. 0scr injection system has compact structure, high integration, strong modularization, convenient and simple maintenance.

★ it is recommended not to disassemble and check the system when it is confirmed that it works normally.

1. Maintenance of SCR supply system

Users must use urea aqueous solution that meets the requirements of the original factory or urea solution that meets the gb29518-2013 standard.

2. Maintenance of urea tank

1) The user shall ensure that the sealing and ventilation performance of the urea tank are intact, the sensor assembly of the urea tank is firmly installed, the return port on the sensor assembly must be kept closed, the filling port shall be normally closed, and the vent hole shall prevent dust from entering.

2) Urea solution addition: the maximum liquid level shall be more than 80% of urea solution. When the urea solution is consumed to 20%, it is necessary to add urea solution:

3) If white crystals are found at the vent valve or liquid filling port during irregular inspection, they can be washed with clean water or wiped with wet cloth

4) Irregularly check whether the plug-ins and pipeline joints are in good condition;

5) If the vent hole is found to be blocked, it can be unscrewed and cleaned or replaced with clean water

6) Clean the urea tank once every 40000 km: open the drain plug at the bottom of the urea tank for cleaning and discharge the precipitation in the urea tank;

Explanation Of Aikelan Gas Assisted Urea Pump Injection System

7) Replace the filter screen in the urea tank once every 80000km. The pore diameter of the filter screen in the urea tank is 70 microns

3. Maintenance of urea supply unit

★ Actnox2. The advantages of urea supply unit of 0 system are as follows: compact structure and simple installation

Re confirm that there is a problem with the urea supply unit, please replace it with a new supply unit. Product disassembly when the product needs to be disassembled due to maintenance or other reasons, the relevant positions shall be cleaned first.

● when the pipeline needs to be disassembled, relevant protective measures shall be taken in time to avoid polluting products and accessories due to external factors and residual liquid in the pipeline. It is recommended to use the plastic protective cap provided by the original factory.

● the compressed air connection must be disconnected. Pay attention to the impact of residual air pressure on the operator when disconnecting the connector. Goggles are recommended

● when removing the electrical connector, ensure that the power supply is disconnected to avoid damage to the system caused by live plug and unplug: the periphery of the connector shall be kept clean and can be removed only after it is determined that there is no urea solution that may splash at the electrical interface.

●When disassembling the urea supply unit, avoid stress on other parts of the module, and properly store it after removal.

Product installation

● be careful when taking out the urea supply unit from the packing box. The plastic protective cap must be kept. When taking it, hold the product body with both hands and do not act on the electrical interface (interface d), urea inlet pipe connector (interface a), injection pipe connector (interface b) and compressed air pipe connector (interface c) to avoid damage.

The urea supply unit is mounted on a bracket.

It is recommended to install the urea supply unit with 4-boat 8 bolts (with washers and flange bolts), and the bolt tightening torque is 22 ± 2n · M

● pipeline connection:

Remove the plastic protective cap of interface a and connect the urea inlet pipe

Remove the plastic protective cap of interface B and connect the injection pipe

Remove the plastic protective cap of interface C and connect the compressed air pipe

Electrical connections:

Remove the protective cap of interface d and connect the electrical connector to ensure that the connector is in place. The connector shall be clean and dry to avoid short circuit of the system caused by conductive foreign matters entering the connector.

● fixing of pipeline harness:

The distance from the first fixed point of the pipeline to the interface shall be less than 20cm, the distance from the first fixed point of the harness to the electrical connector shall be less than 10cm, and it is required to be on the same vibration source as the urea supply unit.

Note: the gas pipeline and urea pipe must be checked for air and liquid leakage during each maintenance

4. Nozzle maintenance

★ urea injection unit has the following advantages: high compatibility, high temperature resistance, automatic cooling, easy installation and maintenance.

In case of nozzle blockage, soak it with purified water at 50 ~ 60 ℃. If the fault cannot be eliminated after soaking for half an hour, replace the nozzle.

Product disassembly

● when the product needs to be disassembled due to maintenance or other reasons, the relevant positions shall be cleaned first.

● when the pipeline needs to be disassembled, relevant protective measures shall be taken in time to avoid polluting products and other accessories due to external factors and residual liquid in the pipeline

● Parts shall be properly stored after removal.

Product installation

● Care must be taken when removing the injection unit from the packing box: the protective cap must be retained.

● Install the injection unit on the base and tighten the fastening bolts. The recommended tightening torque of the bolts is 50 ± 10nm

● Connect the pipeline, remove the protective cap at the SAE connector and connect the urea injection pipe.

5. Maintenance of air filter

Explanation Of Aikelan Gas Assisted Urea Pump Injection System

For the air filter used by aikelan company, it is recommended to check and drain water regularly, wash it with kerosene or gasoline every 40000 km, and dry it in the air or dry it with clean compressed air.

Drainage method: press the valve core at the bottom of the filter to drain the liquid in the filter.

6. Maintenance of temperature sensor and nitrogen oxygen sensor

Explanation Of Aikelan Gas Assisted Urea Pump Injection System

The soot emission of national 4 / 5 diesel engine is very low, and there will be no carbon deposition under normal conditions, and the general carbon deposition will not affect the performance of temperature sensor and nitrogen oxygen sensor. In case of serious carbon deposition, resulting in poor operation of the sensor, the sensor can be cleaned with a soft brush. It is not allowed to clean the sensor by mechanical means or liquid cleaning. Repeated assembly and disassembly of temperature sensor and nitrogen and oxygen sensor are not allowed to prevent damage to the part.

7. Routine maintenance

Regularly check whether the fasteners and connectors of SCR system are loose and deal with them in time.

Check whether the harness is damaged. If so, repair or replace it.

4、 Common fault analysis

Troubleshooting principles:

1) In case of failure in post-processing, you can first check the appearance and some simple methods. Then consider the use of diagnostic tools and calibration tools, and check the faults one by one from easy to difficult.

2) Do not easily replace any accessories until the problem is clear!

3) Pay attention to record the fault code! Do not clear the fault code easily before clarifying the problem!

1. The urea supply unit cannot work normally

1) Check whether the supply unit is installed correctly. The electrical interface shall be vertical and upward, and shall not be installed upside down

2) Check whether the “click” sound inside the supply unit can be heard within a few seconds after the key switch is powered on, and judge whether the urea supply unit is powered on normally. If the heating water valve of urea tank is installed on the vehicle, the heating water valve will also make a self inspection sound under normal conditions after power on.

3) If the sound of self inspection inside the supply unit and self inspection of heating water valve cannot be heard after power on, check whether the harness connector of urea supply unit falls off, whether the harness and connector are damaged, and whether the fuse and battery voltage of SCR system are normal.

4) If you can only hear the self-test sound of the heating water valve of the urea tank and cannot hear the internal self-test sound of the supply unit, it may be an internal fault of the supply unit. First check whether the appearance of the supply unit is damaged. If there is no abnormality, you need to read the fault code with the diagnostic instrument to determine the fault

5) If the self inspection sound is normal, check whether the pipeline from the urea tank to the urea supply unit falls off, bends and damages.

6) Check the compressed air pipe from the urea supply unit to the filter for falling off, bending and damage.

7) Check the compressed air pipe from the filter to the air intake for falling off, bending and damage.

8) When the compressed air pressure of the vehicle is normal, power on the self-test. When the self-test sound inside the supply unit is heard, judge whether there is the sound of compressed air ejected through the urea nozzle. If there is no sound of air flow, check whether the injection pipe from the urea supply unit to the urea nozzle falls off, bends and damages, remove the urea nozzle from the flange and check whether the nozzle hole is blocked. If the spray hole is covered with crystal, immerse the spray hole in clean water for one minute, power on again and check to determine whether compressed air is ejected from the spray hole when urea is supplied for color Qi white inspection.

9) Check whether the vent hole of urea tank is blocked

10) Check whether there is urea in the urea tank.

11) Check whether the exhaust temperature sensor is installed in the correct position on the exhaust pipe.

12) Read out the fault code with the diagnostic instrument, find out the fault point according to the fault code, and eliminate relevant functional faults and faults such as building pressure preparation brick supply unit, injection unit, heating components, exhaust temperature sensor, air pressure, etc. According to the prompt in the fault code table

 

13) If the ambient temperature is lower than – 11 ° C, according to the fault code, eliminate the fault of the aftertreatment heating component to ensure the normal heating function of the aftertreatment system

14) Check whether the air supply pressure is within the normal range of 610bar: check the exhaust temperature sensor, and the system activation temperature is 200 ° C: check whether the nozzle is blocked.

15) Signal quality can also lead to no pressure build-up in the system. Such signals include urea level and urea temperature of urea pump.

16) If there is no problem in the above inspection, but the pressure building fails, it may be urea liquid absorption failure. Use the diagnostic instrument to conduct manual liquid absorption test.

17) Use the diagnostic instrument to read the CID (calibration ID) and confirm whether the software and data versions are correct

2. Urea crystallization failure

1) Use the diagnostic instrument to read out the fault code and determine the fault according to the fault code, such as NOx conversion efficiency and No κ Signal related faults.

2) The large amount of urea injection is one of the reasons for urea crystallization. Check whether the urea injection is faulty and whether there are faults such as abnormal urea injection.

3) Check the exhaust pipe for air leakage, such as cracking. Remove the SCR catalyst and exhaust pipe section to check whether there is obvious urea crystallization inside. If there is obvious crystallization, it will increase the engine back pressure and fuel consumption.

4) Check whether there is urea crystal around the nozzle base.

5) Check whether the nozzle installation angle meets the requirements of the installation manual.

6) Check whether the exhaust pipe downstream of the urea nozzle has obvious corrosion. The ordinary cast iron exhaust pipe will become invalid due to urea corrosion and should be made of stainless steel.

7) Use the diagnostic instrument to read the CID and confirm whether the software and data versions are correct

3. Excessive ammonia smell

1) Check whether the catalyst is damaged or missing. If there is no catalyst, the injected urea will be hydrolyzed and pyrolyzed to produce ammonia, which will not react with NOx in the exhaust gas and will be directly discharged into the atmosphere

2) Confirm whether the carrier in the catalyst is damaged or missing.

3) Read out the fault code with the diagnostic instrument and determine the fault according to the fault code, such as NOx conversion efficiency and NOx signal related faults

4) Use the diagnostic instrument to read the CID and confirm whether the software and data versions are correct.

5) Check the nozzle. If the nozzle is damaged and the atomization is abnormal, the urea injection cannot be completely hydrolyzed, resulting in the reduction of conversion efficiency and the production of ammonia

4. After treatment heating system failure

1) Read out the fault code with the diagnostic instrument and determine the fault according to the fault code, such as the heating and ambient temperature sensor of the aftertreatment system, as well as the heating related faults of urea heating pipe and urea tank.

2) Check the ambient temperature sensor and confirm that the sensor works normally: if the ambient temperature sensor is sent by message, check whether the AB message is sent normally

3) Check the after treatment system heating, urea heating pipe, urea tank water valve and its harness.

4) Check whether the heating water circuit of urea tank circulates normally and whether the water inlet and outlet are connected reversely.

5) If the heating of urea pump reports fault and the fault still exists after power failure and restart, replace the urea supply unit

6) Use the diagnostic instrument to read the CID and confirm whether the software and data versions are correct.

5. Abnormal NOx measurement fault

1) Check that the NOx sensor is installed on the exhaust pipe

2) Check the exhaust pipe to ensure that there is no excessive air leakage in the exhaust pipe.

3) Read out the fault code with the diagnostic instrument and determine the fault according to the fault code, such as the fault related to NOx signal

4) Check the NOx sensor and confirm that the communication and power supply are normal.

5) If necessary, use the diagnostic instrument to read the CID and confirm whether the software and data versions are correct. Read and confirm with the diagnostic instrument

6. Sending and receiving of NOx sensor related messages Reduced NOx conversion efficiency

1) Read out the fault code with the diagnostic instrument and determine the fault according to the fault code, such as the fault related to NOx conversion efficiency.

2) Carry out the following inspections in sequence

Check № ox sensor and exhaust pipe. If the measurement signal of NOx sensor is too large, conversion efficiency fault will be reported

Check the urea injection. If the urea injection amount is too small, the measurement signal of NOx sensor will be too large, resulting in conversion efficiency failure

Check whether there is leakage in the urea injection pipe. If there is leakage, the actual urea injection amount is too small, which will lead to n κ The measurement signal of the sensor is too large, which leads to the failure of conversion efficiency;

Check the urea solution. If the quality of urea solution is unqualified (concentration is lower than 32.5%), the measurement signal of NOx sensor will be too large, resulting in conversion efficiency failure

Check whether there is urea crystallization in SCR catalyst. If so, the speed efficiency will decrease

Check the engine and SCR catalyst. If the engine or SCR catalyst is seriously aged, it will lead to excessive NX original emission or excessive measurement signal of NOx sensor, resulting in conversion efficiency failure

3) If necessary, use the diagnostic instrument to read the CID and confirm whether the software and data versions are correct.

7. Abnormal urea consumption

1) Check the urea tank for leakage and damage.

2) Read out the fault code with the diagnostic instrument and determine the fault according to the fault code, such as nozzle, urea supply unit, function, exhaust temperature sensor, urea tank temperature sensor, etc.

3) If the ambient temperature is lower than 1 ° C, according to the fault code First report: check the heating components of the aftertreatment system to ensure that the heating function of the aftertreatment system is normal.

4) Check whether the urea supply unit works normally.

5) If the system works normally, judge whether the nozzle parts are partially blocked or other faults.

6) Determine the operating conditions of the vehicle. If the vehicle operates in the low load area most of the time, which will lead to low exhaust temperature, urea injection will not be activated (minimum 200 ℃).

7) If necessary, use the diagnostic instrument to read the CID and confirm whether the software and data versions are correct.

6、 Service cycle and maintenance

Actnox2. 0 the service life of the system is 10000 hours, about 500000 km;

It is recommended to drive every 1000 hours or 50000 kilometers for maintenance by professionals.

Chat with us
Chat with us
Questions, doubts, issues? We're here to help you!
Connecting...
We are Sinotruksitrak. Please leave your inquiry and your phone. We will give you feedback within 12 hours.
Our operators are busy. Please try again later
:
:
:
:
Have you got question? Write to us! Please leave your phone or what'sApp
:
:
This chat session has ended